Manufacturer of Polyethylene Pipes and Fittings

Company "ТерПолімерГаз"

Manufacturer of thermistor and butt connecting parts for water and gas supply

“TerPolymerGas” Innovative solutions in laying the gas pipeline to Avdeevka

П

The issue of gas pipelines and Ukrainian gas has always been very important and relevant for Ukraine. We must think and study the ways of extracting and transporting the domestic product, because in an environment where many settlements are cut off from communications in the east, and the requirements of “neighbors” become more stringent, we must look for alternative solutions. That is why, in 2017, “TerPolymerGas” joined the construction of a high-pressure gas pipeline from the Ocheretino gas pipeline to Avdeevka. The construction of the new gas pipeline began because gas supply to a number of settlements was terminated due to an accident on the main gas pipeline. On June 7, 2017, because of shelling of militants, the gas supply system of the city of Avdeevka and a number of settlements were disconnected.

“TerPolymerGas” fulfilled the project of manufacturing and supplying a gas polyethylene two-layer pipe “CordPipe”, namely 315 pipes 11 SDR 8064 m, 280 pipes 11 SDR 6060 m, 225 pipes 11 SDR on January 6 m. For laying the gas pipeline. For the company “TerPolymerGas” this was a priority task, since during the construction a new type of pipe was manufactured. This is the first and so far the only pipeline, mounted from a two-layer pipe. Electrofusion couplings were used by our production of TerPolymerGas. This pipe is more reliable and is designed for installation and operation in harsh environments. When laying this pipe does not require sand, filling that significantly affects the speed of the gasket, as well as the installation price. In addition, the two-layer pipe “CordPipe” has a twice-longer life, especially for a pipeline of such importance. For our company it is a step towards the application of innovative and economically advantageous technologies and the use of the domestic product and European raw materials. In addition to the gas pipe, the company “TerPolymerGas” also produces a two-layer pipe “CordPipe” for water supply in which there are a number of advantages over the conventional (you can find it on poligas.com.ua website)

August 24, 2018 on Independence Day, the President of Ukraine Petro Poroshenko held a solemn ceremony of symbolic start-up of gas on a high-pressure gas pipeline from the GRS Ocheretino to Avdeevka. The total length of the new pipeline is 14,124 km. As of August 24, 2018, more than 5,500 consumers were connected to the gas supply. We hope that this is only the beginning of fruitful cooperation.

 